Skip to content
English
  • There are no suggestions because the search field is empty.

USA Lab UC/DLSB Series Chiller Pump Upgrade Guide

(For replacement pumps purchased after 6/21/23) This guide explains how to upgrade to the new-style pump used on UC Series chillers. Steps include removing the old pump (via a separate guide), checking pump orientation, mounting the new pump to the existing bracket, and reinstalling insulation.

Link to USA Lab UC/DLSB Series Chiller Pump Upgrade Guide


Quick Facts

  • Number of Steps: 4
  • Orientation Check Required: Yes
  • Bracket Reuse: Yes (old bracket retained)

STEP 1 — Remove the Old Pump


STEP 2 — Check Orientation of the New Pump

  • Compare the new-style pump to the old pump:
    • Ensure the inlet and outlet paths match your system.
    • If orientation differs, remove the screws and rotate the housing 180°.

STEP 3 — Attach the New Pump to the Existing Bracket

  • Remove the two bottom screws from the old bracket.
  • Position the new pump onto the bracket.
  • Tighten screws to secure the pump in place.

STEP 4 — Re-wrap Insulation and Reassemble

  • Re-wrap the insulation around the newly installed pump and reverse the disassembly steps to finalize installation.

Contact & Support

If you need help with the upgrade:

📞 (734) 855-4890
📧 tech@usalab.com