Skip to content
English
  • There are no suggestions because the search field is empty.

Vacuum Pump Flushing Guide

This guide outlines the complete flushing and oil-change procedure required after every run. It includes all drain, flush, refill, and verification steps, as well as the required fluids (FF-10 and Inland 19).

Link to Vacuum Pump Flushing Guide


Quick Facts

  • When to Flush: After every run
  • Required Fluids:
    • FF-10 (flushing fluid)
    • Inland 19 (operating oil)
  • Verification: Pump must reach ultimate pressure similar to a new factory unit before use.

Safety Note

  • If the pump does not reach proper ultimate pressure after flushing,
    contact USA Lab for repair assistance.

Flushing Procedure

STEP 1 — Drain the Pump
  • Drain all oil from the pump.


STEP 2 — Close the Drain
  • Close the drain valve after emptying.


STEP 3 — Run Pump Without Oil
  • Run the pump 5–10 seconds with no oil.


STEP 4 — Drain Again
  • Drain the pump again.


STEP 5 — Close the Drain
  • Close the drain valve again.


STEP 6 — Add Flushing Fluid
  • Add FF-10 flushing fluid to the pump.


STEP 7 — Run for 30 Minutes
  • Run the pump for 30 minutes with the KF-25 adapter attached to the Bullseye vacuum gauge.


STEP 8 — Record Vacuum Level
  • Take note of the vacuum level achieved each run.


STEP 9 — Repeat Flush Cycles
  • Repeat from Step 1 until the pump achieves an ultimate pressure similar to a new factory unit.


STEP 10 — Final Drain, Then Refill With Inland 19
  • Repeat Steps 1–5, but fill with Inland 19 instead of FF-10.


STEP 11 — Confirm Ultimate Pressure
  • Check the ultimate pressure one more time.
  • When proper ultimate pressure is reached, the pump is ready for use.

Contact & Support

If your pump fails to reach proper ultimate pressure or shows performance issues:

📞 734-855-4890
📧 support@usalabequipment.com