Skip to content
English
  • There are no suggestions because the search field is empty.

USA Lab CLC Series Temperature Probe Replacement Guide (PLC ONLY)

This guide explains how to test all three temperature probe channels on CLC Series chillers and how to replace a defective probe. It includes channel identification, wiring details, crimping instructions, and installation steps for all three probe locations.

Link to CLC Series Temperature Probe Replacement Guide


Quick Facts

  • Total probe channels: 3
  • Test probe included with kit
  • Silver wire = R+, red wires = R– (positions interchangeable)
  • Replacement uses 3 butt connectors
  • Probes correspond to RED, GREEN, BLUE channel wiring

STEP 1 — Access the Interior of the Chiller

  • Remove the lid and open the front door of the chiller.
  • Locate the probe signal converter, shown in the image on page 1.

STEP 2 — Prepare for Probe Testing

  • Remove the wire channel caps to access the probe wiring.
  • Use the included test probe to check each of the three channels.

STEP 3 — Channel Wiring Identification

  • Page 2 includes both a wiring diagram and a labeled photo:
    • Silver wire = R+
    • Both red wires = R– (their positions do not matter)
    • RED = Channel 1 (liquid temperature probe)
    • GREEN = Channel 2 (compressor exchanger probe)
    • BLUE = Channel 3 (external probe connector)

STEP 4 — Test Each Channel

  • Install the test probe on Channel 1, then press Loop on the touchscreen.
  • If the loop does not start, the probe on that channel is good—the fault lies on another channel.
  • Repeat for all three channels.

STEP 5 — Identify and Cut Out the Defective Probe

  • Once the bad probe is identified:
    • Trace the probe wire to where the white and black wires meet the silver and red wires.
    • Cut the connection point where they join.
    • Prepare the replacement using the three butt connectors provided.

STEP 6 — Crimp New Probe Wiring

  • Strip back the white and black wires.
  • Using a crimp tool, attach the butt connectors as follows:
    • White → Silver
    • Black → Red
    • Black → Red
  • After crimping, shrink the tubing ends with a lighter.
  • Do not overheat the tubing or wires.

STEP 7 — Install the Replacement Probe

Liquid Temperature Probe (Channel 1 – RED)
  • Loosen the set screw on the metal collar.
  • Pull the old probe out and insert the new one.
Compressor Exchanger Probe (Channel 2 – GREEN)
  • This location requires cutting back insulation.
  • Insert the new probe into the same location as the failed one.
  • Ensure the slip-over fabric cover is positioned at the wire exit to prevent cuts from sharp metal.
  • Images on page 5 illustrate the probe seating and insulation area.
External Probe Connector (Channel 3 – BLUE)
  • Replace the probe at the end of the external extension wire.
  • Do not replace the internal wiring; only the removable external probe.

Support

If you need help or run into any issues:

📧 support@usalab.com
📞 (734) 855-4890